Photograph, taken from across the river, of the Cazadero powerhouse/Station G. Part of the roof is incomplete, and three pipes run from the building up the hill. A stairway next to the pipes goes from the building to the top of the hill.
Photograph of a man standing in the Cazadero Dam/Station G transformer house. The man wears a hat and a work apron. The inside of the walls are wooden, with a brick wall visible in the background.
Photograph showing the main turbine unit at Cazadero Dam/Station G. On a small sign at the front of the unit is written “847.” (image note: glass plate is broken on two edges).
Photograph showing exterior damage one day after the 1908 wreck at the Cazadero Dam/Station G due to equipment malfunction. Broken windows and a damaged roofing are visible. Water flows out of pipes in the bottom of the building over the water.
Photograph showing interior damage one day after the 1908 wreck at the Cazadero Dam/Station G due to equipment malfunction. The floor is littered with debris, and a piece of a generator is visible on the left side of the frame. Windows and roofing materials show extensive damage.
Photograph showing construction at Cazadero Dam. The Clackamas River can be seen flowing through the bottom of the dam, and trees are visible on the hillside in the distance. (Image note: similar to PGE7-6, but appears to show further stage of completion).
Photograph showing the exterior of the Cazadero power station taken from across the Clackamas River. Four large pipes run uphill from the building. Previously burnt trees can be seen in the background.
Photograph showing interior damage one day after the 1908 wreck at the Cazadero Dam/Station G due to equipment malfunction. A man stands with debris while looking at the camera, and windows and roofing materials show extensive damage.
Photograph of generator unit #3 at Cazadero Dam/Station G, taken two months after the 1908 accident due to equipment malfunction. On the front of the unit “General Electric Company” is written. A man stands on the left side of the frame with one hand on a wheel.
Photograph looking downriver, showing a bridge above the dam and lodge (building visible on left at top of hill). Another wooden building is visible next to the lodge, and the river continues around a bend into the distance.
Photograph showing the interior of the Cazadero power station at Station G, with the first three generating units. Large rounded windows can be seen on the right side of the high peaked room, and on the side of the generators is written “Allis Chalmers Company.”
Photograph showing the interior of Station G at the Cazadero Dam showing the generator units and building structure. Several large windows an be seen on the left side of the frame, and a man can be seen in the background near the top.
Photograph showing construction at Cazadero Dam. The Clackamas River can be seen flowing through the bottom of the dam, and trees are visible on the hillside in the distance.
Photograph of the lodge building at Cazadero Dam/Station G showing exterior features. Several rocking chairs can be seen on the porch, and foliage grows on the wooden support beams.
Photograph taken from a side angle, looking across a suspension bridge at Cazadero Dam/Station G. The bridge leads to steps, which go to the top of the hill across the water. Several buildings and transmission poles can be seen at the top of the hill. On the left side of the frame, the edge of a brick building can be seen.
Photograph of a construction at the Cazadero Dam during construction. Wooden structure is visible with water from the Clackamas River flowing through the bottom, towards the camera.
Photograph taken from across the water, showing the employee cottages at Cazadero Dam/Station G. Building can be seen at the top of the hill above the river, with several small wooden structures in front of three long buildings. A railroad car is parked on the left side of the frame.
Photograph showing the lodge building (furthest right) at Cazadero Dam/Station G from a far angle, including several other wooden buildings. A wooded and dirt hillside can be seen in the background.
Photograph showing construction at Cazadero Dam. The Clackamas River can be seen flowing on the right side. Ice formations are on the hillside to the left, and snow and frost can be seen on the wooden dam structure.
Photograph of the Cazadero Dam taken in front of the spillway. Water flows over the ledge into a pool at the base, and another stream of water can be seen spilling down on the right side of the frame. The stacked wooden dam structure is visible to the left of the main spillway.
Photograph showing in-progress re-decking of the spillway at the Cazadero Dam/Station G. Men are visible at the top and bottom of the structure, and water and wood debris can be seen below the spillway.
Photograph showing completed re-decking on the spillway at Cazadero Dam/Station G. Wood debris can be seen in the water below the spillway, and leftover ropes, ladders and tools are visible on the lower walkway.
Photograph showing workers during re-decking of the Cazadero Dam. Four men stand at the top of the structure, while one sits on a ladder looking upward. Another part of the wooden dam is visible in the background.
Photograph showing in-progress re-decking of the spillway at the Cazadero Dam/Station G. Men are visible at the top and bottom of the structure, and water and wood debris can be seen below the spillway.
Photograph showing the fishway Cazadero Dam/Station G. A man sits in a boat looking at the camera, with the wooden dam structure is visible behind. Part of the flume can be seen along the right side of the frame.