Photograph looking downriver, showing a bridge above the dam and lodge (building visible on left at top of hill). Another wooden building is visible next to the lodge, and the river continues around a bend into the distance.
Photograph showing in-progress re-decking of the spillway at the Cazadero Dam/Station G. Men are visible at the top and bottom of the structure, and water and wood debris can be seen below the spillway.
Photograph showing completed re-decking on the spillway at Cazadero Dam/Station G. Wood debris can be seen in the water below the spillway, and leftover ropes, ladders and tools are visible on the lower walkway.
Photograph taken from a high angle of penstock units at Cazadero Dam/Station G. The pipes can be seen running downhill towards the in-progress powerhouse, with numerous workers.
Photograph showing construction progress of the powerhouse at Cazadero Dam/Station G, taken from a high angle looking downhill. The foundation can be seen on the near side of the river, with multiple men working. Across the river, a dirt hillside with fallen trees and stumps can be seen.
Photograph, taken from across the river, of the Cazadero powerhouse/Station G. Part of the roof is incomplete, and three pipes run from the building up the hill. A stairway next to the pipes goes from the building to the top of the hill.
Photograph showing in-progress re-decking of the spillway at the Cazadero Dam/Station G. Men are visible at the top and bottom of the structure, and water and wood debris can be seen below the spillway.
Photograph showing construction progress on the intake penstocks at the Cazadero Dam/Station G. Workers are visible in the center of the frame, and five large pipes are seen on the right. Construction debris can be seen throughout the image.
Photograph of a man standing in the Cazadero Dam/Station G transformer house. The man wears a hat and a work apron. The inside of the walls are wooden, with a brick wall visible in the background.
Photograph of the lodge building at Cazadero Dam/Station G showing exterior features. Several rocking chairs can be seen on the porch, and foliage grows on the wooden support beams.
Photograph showing the lodge building (furthest right) at Cazadero Dam/Station G from a far angle, including several other wooden buildings. A wooded and dirt hillside can be seen in the background.
Photograph showing workers during re-decking of the Cazadero Dam. Four men stand at the top of the structure, while one sits on a ladder looking upward. Another part of the wooden dam is visible in the background.
Photograph taken from above Cazadero Dam/Station G, looking downriver towards the spillway and wooden dam structure. Behind, a dirt hillside and trees can be seen.
Photograph looking across the Clackamas River, of a potential dam site for the future River Mill Dam. A rocky cliff-face can be seen across the water, as well as tree at the top of the frame. Written on the negative is “Oct 22, ‘09, PES #2004.”
Photograph taken during a flood at Cazadero Dam/Station G. A large amount of water flows down the spillway on the left side of the image, and the flume is visible across the water.
Photograph showing the flume at Cazadero Dam/Station G during a flood. Rapidly moving water is visible in the Clackamas River below the flume, and a wooden building can be seen on a hillside above.
Photograph showing a partially completed suspension bridge over the Clackamas river near the River Mill Dam site. Cliffs and trees can be seen throughout the image. Written on the negative is “Dec 22, ‘09 – PES 2009.”
Photograph showing a bridge over the Clackamas River, taken from river level looking upward. In the background, a wooden suspension bridge can be seen across the cliffs behind the larger front bridge. Written on the negative is “Dec 22, ‘09 PRD 2007.”
Photograph looking downhill at the Clackamas River, at a potential future dam site for the River Mill Dam. Several cut trees can be seen on the closest hillside, and a rocky ledge is visible across the river. Written on the negative is “Dec 22, ‘09, PES 2013.”
Photograph taken from a side angle, showing the flume at the Cazadero Dam/Station G. Below the wooden flume is a dirt hillside with rocks, and a long wooden building can be seen in the background on the right side of the frame.
Photograph looking towards flume and railway tracks at Cazadero Dam/ Station G. A man stands on the railway tracks in the distance, and a dirt hillside drops down between the tracks and the flume.
Photograph taken from a high angle showing an icy city scene, with large icicles hanging from a utility pole in the foreground. Two churches can be seen in the distance. The church on the right is likely the Immaculate Heart Catholic Church in Northeast Portland.
Photograph showing a suspension bridge over the Clackamas River in near the River Mill dam area. The bridge crosses between two tall cliff faces, beyond which the river can be seen around. Snow is on the ground throughout the image. Written on the negative is “Feb 3, ‘10, PES 2014.”
Photograph showing the interior of Station G at the Cazadero Dam showing the generator units and building structure. Several large windows an be seen on the left side of the frame, and a man can be seen in the background near the top.
Photograph showing the Clackamas River in the River Mill area, with numerous “islands” and cliffs. A wooden suspension bridge can be seen spanning two cliffs near the center of the frame, with numerous wooden buildings visible in the distance. Written on the negative is “#58M. 8-12-10.”
Photograph showing employees with street car in front of the East Ankeny car barn. Written on the building is “PRL & P Co.” (Portland Rail Light & Power Company). Several men sit on the roof of the train, while others line up in the windows and in front. A wooden water tower can be seen in the background. Photograph is a reproduction of a framed image (frame is clearly visible).