Photograph showing a spillway structure during the 1964 Christmas flood (taken December of 1964). Water can be seen rapidly spilling down the structure, with a small building visible at the far side of the river. High water levels can be seen upriver, in addition to forested hillsides and trees.
Photograph looking upstream, below proposed upper dam site at Cazadero Dam/Station G. A railroad track and flume can be seen running into the distance around a hillside, and two possible construction vehicles are visible. The river can be seen on the left side of the frame.
Photograph of the Cazadero Dam taken in front of the spillway. Water flows over the ledge into a pool at the base, and another stream of water can be seen spilling down on the right side of the frame. The stacked wooden dam structure is visible to the left of the main spillway.
Photograph taken from above Cazadero Dam/Station G, looking downriver towards the spillway and wooden dam structure. Behind, a dirt hillside and trees can be seen.
Photograph looking downriver, showing a bridge above the dam and lodge (building visible on left at top of hill). Another wooden building is visible next to the lodge, and the river continues around a bend into the distance.
Photograph showing construction at Cazadero Dam. The Clackamas River can be seen flowing on the right side. Ice formations are on the hillside to the left, and snow and frost can be seen on the wooden dam structure.
Photograph of a construction at the Cazadero Dam during construction. Wooden structure is visible with water from the Clackamas River flowing through the bottom, towards the camera.
Photograph showing construction of Cazadero Dam. Several workers can be seen in the distance at the top of a stacked wooden dam structure, with a dirt hillside above. The Clackamas River is visible at the bottom of the dam, and trees (possibly burnt) can be seen at the top of the hill.
Photograph showing construction at Cazadero Dam. The Clackamas River can be seen flowing through the bottom of the dam, and trees are visible on the hillside in the distance. (Image note: similar to PGE7-6, but appears to show further stage of completion).
Photograph showing construction at Cazadero Dam. The Clackamas River can be seen flowing through the bottom of the dam, and trees are visible on the hillside in the distance.
Photograph taken during a flood at Cazadero Dam/Station G. A large amount of water flows down the spillway on the left side of the image, and the flume is visible across the water.
Photograph showing the flume at Cazadero Dam/Station G during a flood. Rapidly moving water is visible in the Clackamas River below the flume, and a wooden building can be seen on a hillside above.
Photograph taken from across the water, showing the employee cottages at Cazadero Dam/Station G. Building can be seen at the top of the hill above the river, with several small wooden structures in front of three long buildings. A railroad car is parked on the left side of the frame.
Photograph showing exterior damage one day after the 1908 wreck at the Cazadero Dam/Station G due to equipment malfunction. Broken windows and a damaged roofing are visible. Water flows out of pipes in the bottom of the building over the water.
Photograph showing the fishway Cazadero Dam/Station G. A man sits in a boat looking at the camera, with the wooden dam structure is visible behind. Part of the flume can be seen along the right side of the frame.
Photograph taken from a side angle, showing the flume at the Cazadero Dam/Station G. Below the wooden flume is a dirt hillside with rocks, and a long wooden building can be seen in the background on the right side of the frame.
Photograph showing interior damage one day after the 1908 wreck at the Cazadero Dam/Station G due to equipment malfunction. A man stands with debris while looking at the camera, and windows and roofing materials show extensive damage.
Photograph taken from a high angle of penstock units at Cazadero Dam/Station G. The pipes can be seen running downhill towards the in-progress powerhouse, with numerous workers.
Photograph showing construction progress on the intake penstocks at the Cazadero Dam/Station G. Workers are visible in the center of the frame, and five large pipes are seen on the right. Construction debris can be seen throughout the image.
Photograph, taken from across the river, of the Cazadero powerhouse/Station G. Part of the roof is incomplete, and three pipes run from the building up the hill. A stairway next to the pipes goes from the building to the top of the hill.
Photograph showing construction progress of the powerhouse at Cazadero Dam/Station G, taken from a high angle looking downhill. The foundation can be seen on the near side of the river, with multiple men working. Across the river, a dirt hillside with fallen trees and stumps can be seen.
Photograph showing in-progress re-decking of the spillway at the Cazadero Dam/Station G. Men are visible at the top and bottom of the structure, and water and wood debris can be seen below the spillway.
Photograph showing workers during re-decking of the Cazadero Dam. Four men stand at the top of the structure, while one sits on a ladder looking upward. Another part of the wooden dam is visible in the background.
Photograph showing in-progress re-decking of the spillway at the Cazadero Dam/Station G. Men are visible at the top and bottom of the structure, and water and wood debris can be seen below the spillway.
Photograph showing completed re-decking on the spillway at Cazadero Dam/Station G. Wood debris can be seen in the water below the spillway, and leftover ropes, ladders and tools are visible on the lower walkway.